New roofs · Re-roofing
New roofs, laid properly from the rafters up.
When repairs no longer make sense, we strip back to the rafters and rebuild with breathable membrane, treated battens and a covering chosen for your house and your budget.
- Coverings
- Clay, concrete, natural slate
- Standards
- Fully fixed to BS 5534
- Programme
- Most houses 1–2 weeks on site
- Guarantee
- 10 years workmanship

A re-roof is a once-in-a-lifetime job
We treat it that way. Before we quote, we survey the roof structure, ventilation and chimneys, so the price includes everything the job really needs, not just the tiles.
On site you get a named lead roofer, a scaffold that’s safe and tidy, and daily sheeting so the house stays dry however long the job runs.
Our work
What a Durham Coast Roofing re-roof includes
Strip & inspect
Old coverings, battens and felt removed; rafters checked and repaired or sistered where needed.
Membrane & battens
Breathable membrane and graded, treated battens to current standards.
Covering
Clay or concrete tiles, or natural slate, mechanically fixed throughout.
Ridges, hips & verges
Dry-fixed systems that won’t need repointing, or traditional mortar where planning requires it.
Lead & ventilation
New lead to chimneys and abutments, with eaves and ridge ventilation designed in.
When a new roof makes sense
- Repeated repairs in different areas
- Nail fatigue: slates slipping all over
- Tiles delaminating or crumbling
- Sagging along the ridge or rafters
- Original felt that has perished
- You’re adding a loft conversion
| Covering | Look | Typical lifespan | Best for |
|---|---|---|---|
| Clay plain or interlocking tile | Warm, traditional, weathers well | 60+ years | Period houses and conservation areas |
| Concrete interlocking tile | Clean, uniform | 40–60 years | Modern houses, value re-roofs |
| Natural slate | Crisp, dark, classic | 80–100+ years | Victorian and Edwardian terraces |
Do I need planning permission to re-roof?
Usually not when you’re replacing like for like. Listed buildings and conservation areas can be different, and we’ll check with the council before we quote.
How long does a new roof take?
Most terraced and semi-detached houses take one to two weeks on site, depending on the weather and the size of the roof.
What happens if it rains during the job?
We only strip what we can cover the same day, and every open section is sheeted before we leave site.
Other roofing services
Free quotes
Get a price for your new roofs.
Start with your postcode and the job. We’ll take it from there.
Free roof health checks across Seaham, Sunderland, Durham and the coast.